FMC
Liquid applied waterproofing was applied at floor areas for pool and locker rooms. With over 10,000 square feet, waterproofing was coordinated with tile setters and also left exposed with colorized finishes.
arrow_forward
LG North American Headquarters
EDA’s scope of work included the application of hot fluid applied waterproofing, green roof assembly, and concrete and wooden pavers. Both pavers and vegetative assemblies serve as overburden for the waterproofing and 5 inches of insulation.
arrow_forward
Bancroft
This project incorporated two types of single ply membranes: White EPDM and PVC and had tapered and flat insulation over metal decking.
arrow_forward

Wells Fargo Data Center
EDA’s scope of work included opening the existing roof down the metal decking, installing wood blocking and new curb for duct penetration. We flashed the curb with Siplast Veral flashing to match the existing system and to ensure the area is watertight per the Siplast specifications.
arrow_forward

1500 Spring Garden
After a leak response, EDA found a flooded roof with no means of drainage. Our service technician came up with a solution to cut through the existing roof and decking to install a new drain and install a PVC pipe to the lower roof to allow the water to properly drain.
arrow_forward

The Lawrenceville School
This award winning project included a total of 13 buildings’ roofs that were completely restored to their original grandeur over a five year period.