EDA Contractors was awarded a project to include a scope of work that included four different roof assemblies. Our work consists of EPDM, TPO, Hot Melt, and Cold Fluid Applied Waterproofing. Our hot melt assembly includes the installation of porcelain pavers on pedestals over hot melt.
Project Size

EPDM: 38,600 SF; TPO: 91,500 SF; Hot Fluid Applied Waterproofing: 75,700 SF; Kemper: 650 SF

Location

763 Grange Rd, Allentown PA

General Contractor

Turner

Architect

L2 Partridge, LLC.

Manufacturer

American Hydrotech

Our Scope

EPDM, TPO, Hot Melt and Cold Fluid Applied waterproofing

Products

Carlisle Single Ply membrane; American Hydrotech Hot Melt and Kemper cold fluid applied

Project Owner

Air Products & Chemicals Inc.