EDA Contractors was awarded a project to include a scope of work that included four different roof assemblies. Our work consists of EPDM, TPO, Hot Melt, and Cold Fluid Applied Waterproofing. Our hot melt assembly includes the installation of porcelain pavers on pedestals over hot melt.
Project Size
EPDM: 38,600 SF; TPO: 91,500 SF; Hot Fluid Applied Waterproofing: 75,700 SF; Kemper: 650 SF
Location
763 Grange Rd, Allentown PA
General Contractor
Turner
Architect
L2 Partridge, LLC.
Manufacturer
American Hydrotech
Our Scope
EPDM, TPO, Hot Melt and Cold Fluid Applied waterproofing
Products
Carlisle Single Ply membrane; American Hydrotech Hot Melt and Kemper cold fluid applied
Project Owner
Air Products & Chemicals Inc.










×